The same order every time
Programmes move through a documented sequence: customer requirement, engineering review, material selection, mould development, sample approval, production, quality inspection, delivery. We do not skip sample sign-off to chase a date.
Engineering review before steel
We assess mouldability, tolerances and design-for-manufacture opportunities while the part is still a drawing. Wall-thickness consistency, shut-off faces and material choice are cheaper to fix on paper than in a cavity.
Sample, then production
First-off samples are produced and submitted for your sign-off. Approved tooling then moves into production runs on fully automatic injection moulding machines or semi-automatic hydraulic machines, depending on the job. Tonnage and available capacity are confirmed against the part at quotation.
Inspection is not a last-minute gate
Incoming material, in-process checks, dimensional inspection against the drawing, and a final visual/functional check happen before packing. We inspect at defined intervals through the run, not only on the first good part.